Normal view

There are new articles available, click to refresh the page.
Before yesterdayMain stream

Mastering SAP Stock Transport Orders (STO)

Home » MM

Efficient stock movement is critical for seamless supply chain operations, and Stock Transport Orders (STO) in SAP play a key role in ensuring smooth intercompany and plant-to-plant transfers. This makes Mastering Stock Transport Orders (STO) in SAP along with it’s Process, Configuration & Best Practices are even more desired.

Whether we are managing internal stock transfers, intercompany logistics, or cross-plant replenishment, a well-configured STO process can reduce costs, improve inventory visibility, and streamline procurement workflows.

In this post, we will explore mastering end-to-end Stock Transport Orders (STO) in SAP S/4HANA and SAP ECC., it’s Process, key Configuration steps & Best Practices.

1. Stock Transfer in SAP

As we have already described in the below post there are two types of stock transfer in SAP.

  • Stock Transfer with MIGO (Without STO, Delivery & Billing)
  • Stock Transfer With Stock Transport Order, Purchase Order (STO/PO)
Picture: Stock Transfer in SAP

Please see the below post to check the “Stock Transfer with MIGO (Without STO, Delivery & Billing)”

STO in SAP: The Best Guide with All Scenarios Explained

Here in the post , we will see the below part in detail

Picture: Stock Transfer With Stock Transport Order, Purchase Order (STO/PO)

2. Stock Transfer With Stock Transport Order/Purchase Order (STO/PO)

Stock Transport Orders (STO) in SAP play a crucial role in inventory management, procurement, and intercompany logistics. Whether you’re transferring stock between plants, company codes, or warehouses, understanding the different types of STO orders is essential for optimizing supply chain efficiency and cost control.

There are total 3 types of the Stock Transfer With Stock Transport Order, Purchase Order (STO/PO)

  • Stock Transfer with STO but without Delivery & Billing
  • Stock Transfer with STO & Delivery but Without Billing
  • Stock Transfer with STO, Delivery & Billing
Picture: Types of Stock Transfer With Stock Transport Order, Purchase Order (STO/PO)

We will look into all the three method of stock transfer with STO/PO one by one in detail

2.1 Stock Transfer with STO but without Delivery & Billing

This type of STO is used when transferring stock between two plants within the same company code. It ensures better inventory tracking and valuation compared to a standard transfer posting.

Below is the pictorial representation of this type of STO

Picture: Stock Transfer with STO but without Delivery & Billing

2.1.1 Key Features

To simplify the process for internal stock transfers, businesses may choose to use STO without delivery and billing,

–> STO is a specialized purchase order used for stock movement between two plants, allowing the receiving plant to place an order for stock from the supplying plant.

–> STO enables smooth inventory management and tracks the movement of stock.

–> STO without delivery is used when there is no need to track the logistical steps involved in physically shipping the goods.
 
–> STO without delivery reduces the administrative workload associated with generating and managing delivery documentation.

–> Stock’s value between the plants is accounted via internal material valuation rather than through external invoicing or billing.

–> Uses a purchase order (PO) document type UB.

--> Stock Transfer with STO but without Delivery & Billing can not be executed in 1-step i.e.2-steps only.

--> If any of the supplier plant or customer plant belongs to the different company code then STO process becomes intercompany STO process.

--> If supplier plant & customer plant belongs to the same company code then STO process becomes intra-company STO process.

--> This process uses movement type 351

2.1.2 Advantage of Using STO Without Delivery & Billing

A manufacturing company transfers raw materials from Plant A (Production Plant) to Plant B (Distribution Center) under the same company code.

Below are the main Advantage of Using STO Without Delivery & Billing

  • Efficiency in Stock Movements: By skipping the delivery and billing steps, stock transfers are more quickly, especially for frequent internal movements.
  • Simplified Documentation: Reducing extensive documentation such as billing and delivery notes helps in streamlining internal operations and save time.
  • Cost Reduction: Delivery and billing elimination in intra-company transfers reduces administrative and logistical costs.
  • Ideal for Intra-company Movements: STO Without Delivery & Billing is best suited for the organizations that frequently move stock between plants without needing to generate financial documents between company codes.

2.1.3 Business Scenarios of STO without Delivery & Billing

Below are the main business Scenarios of the STO without Delivery & Billing

  • Plant-to-Plant Transfers: Stock movement for production needs or inventory balancing can be done using STO without delivery or billing.
  • Distribution Center Replenishment: Companies with multiple storage locations can use Stock Transfer with STO but without Delivery & Billing to replenish stock without the need for complex documentation

2.1.4 Configuration & Testing of STO without Delivery & Billing

Please see the below post for the details of configuration & testing of STO without Delivery & Billing

SAP Stock Transport Order Without Delivery: Process, Configuration & Guide

2.2 Stock Transport Order with Delivery (STO with SD Delivery Process)

This STO type is used when stock transfers require a delivery document generated via SAP SD (Sales & Distribution Module). This is common when warehouse teams handle goods movement through outbound deliveries.

This setup is particularly useful for intra-company transfers where financial transactions are not required

Please see the below picture to see the pictorial representation of this stock transfer method

Picture: Stock Transport Order with Delivery (STO with SD Delivery Process)

2.2.1 Key Features of Stock Transport Order with Delivery but Without Billing

  • STO with delivery uses delivery document to track the logistics of stock movement.
  • The delivery is essential to monitor goods physically leaving one plant and being received by another.
  • Since this process is usually used in intra-company STO process, billing is not required to allow for smoother internal movements of stock without generating invoices or financial documents.
  • In the case of “Stock Transfer with STO & Delivery but Without Billing”, the cost and inventory valuation are adjusted internally, without the need for billing documentation.
  • “Stock Transfer with STO & Delivery but Without Billing” can include shipping cost determination

2.2.2 Business Scenario for Stock Transport Order with Delivery but Without Billing

Below are the main Business Scenarios for Stock Transport Order with Delivery but Without Billing

  • Internal Plant-to-Plant Transfers: The scenario of regularly move stock between plants within the same company code like Distribution Center, production center etc. , STO with delivery but no billing simplifies this move.
  • Replenishing Inventory Between Storage Locations: Stock movements is easily managed without billing complexity with delivery tracking for the distribution centers or warehouses under the same legal entity.

2.2.3 Advantage of Stock Transport Order with Delivery but Without Billing

Below are the main advantage of using STO & Delivery Without Billing

  • Efficiency in Intra-company Stock Movements: Stock Transfer using STO & Delivery Without Billing Eliminates the billing step which reduces complexity and speeds up the stock transfer.
  • Simplified Documentation: In this process business can focus on tracking deliveries and managing inventory as there is no need to generate financial documents.
  • Cost Control: Elimination of billing process saves administrative and financial costs.
  • Enhanced Inventory Tracking: This process uses delivery. Delivery documents allows to maintain a clear record of stock movements without the need for complex financial reconciliation.

2.2.4 Configuration & Testing of STO with Delivery but Without Billing

Please see the below post for the details of configuration & testing of STO without Delivery & Billing

SAP Stock Transport Order with Delivery: Setup, Execution & Key Insights

2.2.5 Special Scenario

We have configured a Special Scenario for Stock Transfer with STO/PO – STO with delivery – Configuring 1-step & 2-step between the same plants

Please see the details of this scenario in the below post

Maximize SAP Efficiency: Configure 1-Step STO with Delivery Alongside 2-Step STO Between the Same Plants

2.3 Inter-Company STO with Delivery & Billing

Intercompany STO is used when transferring stock between plants in different company codes. It requires a more complex process as it involves intercompany billing and affects financial accounting entries.

Please see below the pictorial representation of this method of stock transfer

Picture: Inter-Company STO with Delivery & Billing

2.3.1 Key Features

  • Uses a purchase order (PO) document type NB
  • Requires billing document
  • Includes intercompany invoice posting
  • Can involve profit center accounting

2.3.2 Business Scenario

A company transfers finished goods from Plant X (Company Code 1000) to Plant Y (Company Code 2000), where Company Code 1000 issues an invoice to Company Code 2000 for the stock transfer.

2.3.3 Configuration & testing of Intercompany Stock Transport Order (Inter-Company STO)

Please see the below post for the details of configuration & testing of SAP Intercompany STO Process with Delivery & Billing

How to Configure SAP Intercompany STO Process with Delivery & Billing

Image by upklyak on Freepik

The post Mastering SAP Stock Transport Orders (STO) appeared first on Ultimate SAP Guides | S4 HANA Logistics Modules.

By: admin
3 April 2025 at 11:53

Maximize SAP Efficiency: Configure 1-Step STO with Delivery Alongside 2-Step STO Between the Same Plants

Home » MM

In the fast-paced world of SAP logistics, optimizing Stock Transport Orders (STO) is crucial for efficient inter-plant stock movement. While the 2-Step STO with Delivery is commonly used, many businesses seek a streamlined 1-Step STO with Delivery to reduce processing time and improve supply chain efficiency. But how do you configure both 1-Step and 2-Step STOs between the same plants without conflicts?

In this guide, we’ll walk you through the step-by-step process to set up a 1-Step STO with Delivery alongside an already configured 2-Step STO, ensuring seamless operations. Whether you’re an SAP consultant, MM specialist, or supply chain manager, mastering these configurations will help you boost workflow efficiency, minimize lead time, and optimize inventory management. Let’s dive in!

IN the below post we have configured 2 step STO with delivery to transfer the stock from the plant PA10 to PA20

SAP Stock Transport Order with Delivery: Setup, Execution & Key Insights – 1.1 Two Step Stock Transfer Order with Delivery

Picture: Two Step Stock Transfer Order with Delivery from Plant PA10 to Plant PA20

There are some business scenarios where sometimes 1 step stock transfer fits more compare to 2-steps STO between the same plants (PA10 to PA20 as shown in the below picture)

Picture: 1-Step STO with Delivery

1. Business Scenarios Requiring Both 1-Step & 2-Step STO Between the Same Plants

Here are some real-world business scenarios where both 1-Step STO with Delivery and 2-Step STO with Delivery may be required between the same plants in SAP

1.1 Urgent Stock Replenishment vs. Regular Stock Transfers

  • 1-Step STO with Delivery: Used when there is an urgent demand for materials at the receiving plant (e.g., production is halted due to a stockout).
  • 2-Step STO with Delivery: Used for routine stock transfers where goods are first shipped to a transit location before final receipt.

1.2 High-Value vs. Low-Value Materials

  • 1-Step STO with Delivery: Used for low-value consumables that do not require detailed tracking and can be moved directly.
  • 2-Step STO with Delivery: Used for high-value materials requiring stricter inventory control and a two-step verification process.

1.3 Same-Region vs. Distant Warehouse Transfers

  • 1-Step STO with Delivery: Used when both plants are in close proximity, allowing for direct shipment without intermediate storage.
  • 2-Step STO with Delivery: Used when the supplying and receiving plants are far apart, requiring goods to be staged at a distribution center before final delivery.

1.4 Perishable vs. Non-Perishable Goods

  • 1-Step STO with Delivery: Used for perishable goods (e.g., fresh food, pharmaceuticals) where minimizing transit time is critical.
  • 2-Step STO with Delivery: Used for non-perishable goods where interim storage or inspection is needed before final delivery.

1.5 Make-to-Order vs. Make-to-Stock Production

  • 1-Step STO with Delivery: Used in a Make-to-Order (MTO) scenario, where materials are transferred directly to fulfill an order.
  • 2-Step STO with Delivery: Used in a Make-to-Stock (MTS) scenario, where stock is staged before final distribution.

2. How to Configure Both 1-Step & 2-Step STO Between the Same Plants

We have already configured 2-step stock transfer between the plants PA10 to PA20 in the below post

SAP Stock Transport Order with Delivery: Setup, Execution & Key Insights – 1.1 Two Step Stock Transfer Order with Delivery

Now we will see in detail how to configure 1-step STO between the same plants (from Plant PA10 to Plant PA20)

How to Configure 1-Step STO with Delivery Alongside 2-Step STO Between the Same Plants: 7 Easy Steps

  1. Step 1: Configure a Customized STO Document Type

    We will configure a different PO document type “YUD” to be used for 1-step STO with delivery compare to “UD” used in 2-step STO with delivery

  2. Step 2: Configure Allowed Item Category

    We will use Allowed Item Category for 1-Step STO with Delivery “U”. It is same as used in 2-step STO with delivery

  3. Step 3: Configure Delivery Type

    We will configure a different Delivery Type “YNL” to be used with 1-step STO with delivery compare to “NL” used with 2-step STO with delivery

  4. Step 4: Item Category Configuration & Determination

    We will configure a different Item Category “YNLN” to be used with 1-step STO with delivery compare to “NLN” used with 2-step STO with delivery

  5. Step 5: Schedule Line Category Configuration

    We will configure a different Schedule Line Category “ZN” to be used with 1-step STO with delivery compare to “NN” used with 2-step STO with delivery. Item category “ZN” will use 1-step stock transfer movement type “647”.

  6. Step 6: Configure Delivery Type & Availability Check Procedure by Plant

    In this configuration we will maintain the 1-step STO document type “YUD” with 1-steo delivery type “YNL” configured in the above steps.

  7. Step 7: Assign 1-step Procedure

    Since now the stock transfer from the plant PA10 to PA20 is to be done in 1-step, we will define the purchasing document type of stock transport orders (YUD) to post the goods issue and goods receipt at the same time.

Step 1: Configure a Customized STO Document Type

We will configure all the required elements for 1-Step STO with delivery like PO Document type, Delivery Type, Schedule Line Type, etc.

--> We need separate PO Doc type for 1-step STO with delivery in order to be able to assign different schedule line to have a different movement type (Movement Type-647) compare to 2-step STO with delivery (Movement Type-641)

a) Configure PO Doc. Type for 1-Step STO with Delivery

In this configuration

–> We Check and copy existing document types for purchase orders and

–> define allowed item categories for each document type

Document types configuration controls item interval, determine allowed follow-on document types & number range interval etc.

We will use PO document type YUD for 1-Step STO with delivery

Follow the below path for document type configuration

SPRO –> Materials Management –> Purchasing –> Purchase Order –> Define Document Types for Purchase Orders

Picture: PO Document Type for 1-Step STO with Delivery

b) Configure Pricing Schema for 1-Step Stock Transfer Order with Delivery

Please check the below post to Configure Pricing Schema for STO Without Delivery. It is same as for this process

Ultimate guide to SAP S4 HANA MM Pricing Procedure – Pricing Schema for Stock Transport Orders

Step 2: Configure Allowed Item Category for 1-Step STO with Delivery

For 1-STO with Delivery, Allowed Item Category is “U”

Picture: Allowed Item Category for 1-Step STO with Delivery

Step 3: Configure Delivery Type for 1-Step STO with Delivery

We will use PO Delivery Type “YNL” for the 1-Step Stock Transfer Order with Delivery.

Please see below post for delivery type “YNL” configuration

SAP Delivery Guide: Outbound to Inbound – YNL-1 Step STO with Delivery

a) Copying Control from STO to Delivery

For the 1-step SAP Stock Transport Order with Delivery, PO document type is “YUD” & delivery type is “YNL”.

--> For Delivery "YNL" , Predecessor document is Purchase Order instead of Sales order.

--> in this case We take source Sales Doc. Type as "DL"

We need to configure copying control in order to create “YNL” delivery on the basis of “DL” document type.

Please check the below post for the detail of copy control configuration for this scenario

SAP Delivery Guide: Outbound to Inbound -Copy Control for 1-Step Stock Transfer Order with Delivery

Step 4: Item Category Configuration & Determination for “1-Step Stock Transfer Order with Delivery”

For “1-Step Stock Transfer Order with Delivery”, item category “YNLN” is used.

Please check the below post for item category configuration & determination

Mastering SAP Sales Item Categories: A Comprehensive Guide-Item Category for 1-Step Stock Transfer Order with Delivery

Mastering SAP Sales Item Categories: A Comprehensive Guide Item Category Determination for 1-Step Stock Transfer Order with Delivery

Step 5: Schedule Line Configuration & Determination for “1-Step Stock Transfer Order with Delivery”

For 1-Step Stock Transfer Order with Delivery, schedule line category “ZN” is used.

SAP Schedule Line Categories Explained: Everything You Need to Know – 1-Step Stock Transfer Order with Delivery “ZN”

SAP Schedule Line Categories Explained: Everything You Need to Know – Schedule Line Category Determination for 1-Step Stock Transfer Order

Step 6: Configure Delivery Type & Availability Check Procedure by Plant

Here we will do the necessary configuration for Stock Transfer Order (STO).

First we will configure delivery type and availability check for 1-step stock transport order.

Follow the below path

SPRO –> Materials Management –> Purchasing –> Purchase Order –> Set up Stock Transport Order –> Configure Delivery Type & Availability Check Procedure by Plant

In this configuration we specify whether an SD delivery is to be created in the case of a PO with a certain combination of supplying plant and document type.

You can also specify which delivery type is to be used.

For 1-Step STO with delivery we use stock type “YUD” with delivery type “YNL”

Configure “1-Step Stock Transfer Order with Delivery”

Step 7: Assign 1-step Procedure

Since now the stock transfer from the plant PA10 to PA20 is to be done in 1-step, we will define the purchasing document type of stock transport orders (YUD) to post the goods issue and goods receipt at the same time.

Follow the below path

SPRO –> Materials Management –> Purchasing –> Purchase Order –> Set up Stock Transport Order –> Assign Document Type, One-Step Procedure, Underdelivery Tolerance

3. Testing of the 1-Step STO with Delivery

In the post given below we have tested 2-step stock transfer with delivery to transfer the stock from plant PA10 to plant PA20

SAP Stock Transport Order with Delivery: Setup, Execution & Key Insights – Testing of Two Step Stock Transfer Order with Delivery

Now we have configured 1-step stock transfer between same plants.

Let’s test 1-step stock transfer in detail between Plant PA10 & Plant PA20.

3.1 Extend the material in the receiving plant

Here sending plant is PA10 & Receiving plant is PA20.

The material should be available in both sending & receiving plants. Please check the below post to see the step be step explanation of how to extend the material to another plant

2 Minutes Guide to Create your First Material in S4 HANA – Extension of Material to Other Plants

3.2 Suppling Plant as a supplier in the Receiving Plant Purchasing Organization

We will create the suppling plant PA10 as a supplier as “PA10_PLANT” Please check the below post in detail

How To Configure S4HANA BP and CVI In 7 Easy Steps – Creation of BP Supplier for STO with Delivery Scenario

3.3 Receiving as a customer in the Sending Plant Sales Organization & Distribution Channel.

We will create the Receiving Plant PA20 as a customer as “PA20_CUST”. Check the below post for details

How To Configure S4HANA BP and CVI In 7 Easy Steps – Creation of BP Customer for STO with Delivery Scenario

3.4 Define Shipping Data for Plants

This Configuration es exactly same as for 2-Step STO with Delivery. Please see below post to see the details of this configuration.

2-Step SAP Stock Transport Order with Delivery: A Complete Guide – Define Shipping Data for Plants

3.5 Create the STO & check the Presence of “Shipping” Tab.

Create the STO now. Start ME21N , input all the data and press enter

“Shipping” tab with “Shipping” data should appear in the PO line item

Picture: Shipping TAB in 1-Step STO with Delivery
--> Delivery type is "YNL" as configured in the section Configure Delivery Type for Two Step Stock Transfer Order with Delivery

--> Shipping Point is "PA10" as configured in the post Configure SAP S4 HANA Logistics Execution Organization Structure in 5 Minutes – Define Shipping Points

--> Route in STO is determined as "PA1020" as configured in the section Route Determination Configuration Between Plant PA10 & PA20 (Route "PA1020")

3.6 Create the Outbound Delivery

Create the outbound delivery through VL10B or create the delivery automatically through batch job.

We need to configure copying control in order to create “YNL” delivery on the basis of “YUD” document type. Please check the below post for the detail of copy control configuration for this scenario

SAP Delivery Guide: Outbound to Inbound -Copy Control for 1-Step Stock Transfer Order with Delivery

Please see the below post to check the detail configuration of automatic delivery creation

2-Step SAP Stock Transport Order with Delivery: A Complete Guide – Activate Automatic Delivery Creation

Please check the movement type & item category in the outbound delivery.

Item Category in Outbound delivery for 2-Step STO with Delivery

Picture: Item Category in Outbound Delivery for 1-Step STO with Delivery

Movement Type in Outbound delivery for 1-Step STO with Delivery

Picture: Movement Type in Outbound Delivery for 1-Step STO with Delivery
--> Movement Type should be "647" & Item category should be "YNLN" as configured for 1-Step STO with Delivery

--> Movement type comes from the scheduling line configuration as explained in the Heading Schedule Line configuration & determination for “1-Step Stock Transfer Order with Delivery”

--> Item category "YNLN" configuration & determination is explained in the Heading Item Category configuration & determination for “1-Step Stock Transfer Order with Delivery”

a) Delivery Scheduling and Transportation Scheduling

Delivery scheduling & transportation scheduling is done same as 2-step stock transfer order with delivery as given in the below post

2-Step SAP Stock Transport Order with Delivery: A Complete Guide – Delivery Scheduling and Transportation Scheduling in SAP S/4 HANA

This completes the configuration of 1-Step STO with delivery.

3.6 Single Transaction Goods Issue & Goods Receipt

Now we do the pick pack & Goods issue to the outbound delivery

--> In the 1-Step STO with delivery, as soon as we do goods issue to the outbound delivery in the issuing plant, goods receipt in the receiving plant happens automatically. 

--> Since Goods receipt happens automatically based on the PO (no inbound delivery is required), so there should be no "confirmation control key" in the PO.

--> Since there is no requirement of inbound delivery in the receiving plant (GR happens based on PO), there is no requirement of SPED configuration for 1-Step STO with delivery

Please check the PO history after outbound delivery PGI. System has posted Goods Receipt as well.

Picture: Goods issue & Goods Receipt together in 1-Step STO with delivery

Below accounting document will be generated at PGI

Picture: Accounting Document in 1-Step STO with Delivery
--> We can post invoice for any delivery cost. But since this is intra company Stock transfer so material cost can not be invoiced. 

This completes the process to Configure & test 1-Step STO with Delivery in addition to the 2-Step STO with delivery Between the Same Plants.

Image by freepik

The post Maximize SAP Efficiency: Configure 1-Step STO with Delivery Alongside 2-Step STO Between the Same Plants appeared first on Ultimate SAP Guides | S4 HANA Logistics Modules.

By: admin
10 October 2024 at 07:14

SAP Stock Transport Order with Delivery: Setup, Execution & Key Insights

Home » MM

SAP Stock Transport Order (STO) with Delivery is a critical process for businesses optimizing intercompany and intracompany goods movement while ensuring seamless logistics execution. Understanding how to set up and execute an STO with delivery can significantly enhance supply chain efficiency, reduce costs, and improve compliance with SAP best practices. In this comprehensive guide, we’ll walk you through the step-by-step configuration, execution, and key insights that drive successful STO implementation. Whether you’re an SAP consultant, business analyst, or supply chain manager, mastering STO with delivery will help you streamline operations, minimize delays, and maximize operational efficiency. Let’s dive into the setup, process flow, and expert tips for leveraging SAP Stock Transport Orders with delivery.

Stock Transport Order (STO) with Delivery is a SAP process to transfer the stock between two plants within a company along with using deliveries via the SAP Shipping module.

--> This post is for "SAP Stock Transport Order with Delivery but without Billing". It is called "intra-company SAP Stock Transport Order with Delivery (and without Billing)".

--> Please check the below post for SAP Stock Transport Order with Delivery & billing. It is also called Cross company or Inter-Company SAP Stock Transport Order with Delivery & Billing.

We have seen details of the two simplest form of Stock transfer till yet

1- Stock Transfer with MIGO (no STO, No delivery & no Billing)

Stock Transfer in SAP: The Best Guide with All Scenarios Explained – Stock Transfer with MIGO (Without STO, Delivery & Billing)

2- Stock Transfer with STO (no delivery & no Billing)

SAP Stock Transport Order Without Delivery: Process, Configuration & Guide

Unlike the above two simple form of stock transfer, the STO with Delivery adds an additional layer of control by allowing users to generate delivery documents, handle shipping logistics, and track goods through the delivery process.

SAP Stock Transport Order with Delivery ensures that supply and receiving plants has the visibility over stock movements, improving accuracy and efficiency.

Below is the pictorial representation for this type of stock transfer

Picture: SAP Stock Transport Order with Delivery

1. Type of SAP Stock Transport Order with Delivery

There are two types of SAP Stock Transfer Order with Delivery

  • Scenario 1: Two Step Stock Transfer Order with Delivery
  • Scenario 2: One Step Stock Transfer Order with Delivery

1.1 Two Step Stock Transfer Order with Delivery

The business scenario for SAP Stock Transport Order with Delivery is when plants are located far away and we need to transfer the goods. While transferring, goods remains in transit for a substantial time.

In this scenario we use 2 step SAP Stock Transport Order with Delivery

in the two Step Stock Transfer Order with Delivery, the quantity issued from the sending plant is posted as stock in transit of the receiving plant. This is the first step. This enables the quantity “on the way” to be monitored.

In the second step goods receipt is posted in the receiving plant and then it becomes the stock of the receiving plant.

Below is the pictorial representation of Two Step Stock Transfer Order with Delivery

Picture: Two Step Stock Transfer Order with Delivery

1.1.1 Configuration of Two Step Stock Transfer Order with Delivery

We will configure Intra-Company Stock Transport Order Wit Delivery step by step

1.1.1.1 Configure PO Document Type

In this configuration

–> we Check and copy existing document types for purchase orders and

–> define allowed item categories for each document type

Document types configuration controls item interval, determine allowed follow-on document types & number range interval etc.

--> For our car business, we will use standard document type "UD" for the "Two Step Stock Transfer Order with Delivery"

Follow the below path for document type configuration

SPRO –> Materials Management –> Purchasing –> Purchase Order –> Define Document Types for Purchase Orders

Picture: Document Type “UD”
1.1.1.2 Item Category

Item category defines how the procurement of a material or service item is controlled.

For the document type “UD” item category U is used

Picture : Allowed Item Categories “U” for “Doc Type “UD”

Note : Item Categories can not be configured. These are maintained by SAP, therefore we cannot change them. However, we can change the “External Representation” of PO item categories in IMG.

1.1.1.3 Configure Pricing Schema for Two Step Stock Transfer Order with Delivery

Please check the below post to Configure Pricing Schema for STO Without Delivery

Ultimate guide to SAP S4 HANA MM Pricing Procedure – Pricing Schema for Stock Transport Orders

1.1.1.4 Configure Delivery Type for Two Step Stock Transfer Order with Delivery

Delivery type “NL” is used for the Two Step Stock Transfer Order with Delivery.

Please see below post for delivery type “NL” configuration

SAP Delivery Guide: Outbound to Inbound – NL – Replenishment Delivery

1.1.1.5 Item category configuration & determination for “Two Step Stock Transfer Order with Delivery”

For “Two Step Stock Transfer Order with Delivery”, item category “NLN” is used.

Please check the below post for item category configuration & determination

Mastering SAP Sales Item Categories: A Comprehensive Guide-Item Category for Stock Transfer Order with Delivery

Mastering SAP Sales Item Categories: A Comprehensive Guide-Item Category Determination for Stock Transfer Order with Delivery

1.1.1.6 Schedule Line configuration & determination for “Two Step Stock Transfer Order with Delivery”

For Two Step Stock Transfer Order with Delivery, schedule line category “NN” is used.

SAP Schedule Line Categories Explained: Everything You Need to Know – Stock Transfer Order with Delivery “NN”

SAP Schedule Line Categories Explained: Everything You Need to Know – Schedule Line Category Determination Stock Transfer Order With Delivery

1.1.1.7 Define Shipping Data for Plants

For the stock transfer order to work , the below two mandatory to define

--> Suppling Plant should be created as supplier in the receiving plant purchasing organization

--> Receiving plant should be created as customer in the sending plant sales organization & distribution channel.

Follow the below path

SPRO –> Materials Management –> Purchasing –> Purchase Order –> Set up Stock Transport Order –> Define Shipping Data for Plants

Here sending plant is PA10 & Receiving plant is PA20

a) Shipping Data for Sending Plant

Through this configuration, system needs to identify the sales organization, distribution channel & division of the supplying plant under which the receiving plant is created as customer

Picture: Shipping Data for sending plant

So as per this configuration receiving plant should be created as customer in Supplying plant sales organization “PA10” , Distribution Channel “PA” & Division “DC”

b) Shipping Data for Receiving Plant

For receiving plant, system identifies receiving plant customer number.

Picture: Shipping Data for Receiving Plant

Receiving plant PA20 will be represented as a customer through customer number “PA20_CUST” as per this configuration

1.1.1.8 Configure Stock Transfer Order

Now we will configure define delivery type and availability check for two step stock transport order.

Follow the below path

SPRO –> Materials Management –> Purchasing –> Purchase Order –> Set up Stock Transport Order –> Configure Delivery Type & Availability Check Procedure by Plant

In this configuration we specify whether an SD delivery is to be created in the case of a PO with a certain combination of supplying plant and document type. You can also specify which delivery type is to be used.
The delivery type in Sales and Distribution (SD) determines how a delivery is handled. In the standard system, the delivery type ‘NL’ is used for stock transfers without a billing document. For stock transfers with a billing document, the delivery type ‘NLCC’ is used.

Configure “Two Step Stock Transfer Order with Delivery”
a) Configure Delivery Type “NL”

Please check below post for detail of delivery type “NL” configuration

SAP Delivery Guide: Outbound to Inbound – NL – Replenishment Delivery

b) Copying Control from STO Doc Type “UD” to Delivery type “NL”

Since in the above configuration, for the 2-step SAP Stock Transport Order with Delivery, PO document type is “UD” & delivery type is “NL”, we need to configure copying control in order to create “NL” delivery on the basis of “UD” document type.

Please check the below post for the detail of copy control configuration for this scenario

SAP Delivery Guide: Outbound to Inbound – Copy Control for Stock Transfer Order with Delivery.

c) Delivery Scheduling and Transportation Scheduling in SAP S/4 HANA

For stock transport orders, scheduling is activated while configuring stock transport order

Picture: Delivery Scheduling and Transportation Scheduling in STO

Follow the below Customizing node 

SAP IMG > Cross-Application Components > Advanced Available-to-Promise > Configure Activities for Specific Document Type > Stock Transport Orders.

it will give you same screen as above

--> Delivery scheduling are defined either in the route or the shipping point.
d) Transportation Scheduling Lead Times

The main parameter for transportation scheduling is transportation lead time.

Transportation lead time is defined by the transit time and unloading time. When an availability check is triggered, system executes backward scheduling from the requested delivery date (LFDAT). System deduct the transit time from RDD (Requested Delivery Date) to arrive at the goods issue date (WADAT). Routes are used to determine the transit durations.

Once a route is determined, the transit duration from the route is used as the lead time for scheduling. The route also specifies the transportation lead time, which is used to determine the transportation planning date.

e) Route Configuration

First we will configure a route to use for the transportation from plant PA10 to plant PA20

Follow the below path

SPRO –> Logistics Execution –> Transportation –> Basic Transportation Functions –> Routes –> Define Routes –> Define Routes and Stages

We will configure route “PA1020”

Picture: Configuration of Route “PA1020”

For the route “PA1020” we have configured–

  • Transit time is 1 Calendar day.
  • Transportation Lead Time is 2 Days
f) Route Determination Configuration Between Plant PA10 & PA20 (Route “PA1020”)

Now we will configure the route determination for Route “PA1020”

–> Outbound shipping point PA10 is assigned to the plant PA10

–> Outbound shipping point PA30 is assigned to the plant PA20

–> Shipping point PA10 & PA30 both has transportation zone assigned as “0000000001-Region East”

Please check the below post for detail

Configure SAP S4 HANA Logistics Execution Organization Structure in 5 Minutes – Define Shipping Points

To configure the route determination, follow the below path

SPRO –> Logistics Execution –> Transportation –> Basic Transportation Functions –> Routes –> Route Determination –> Maintain Route Determination

Route is determined based on the shipping type from the customer master & Transportation Group from the material master

Picture: Configuration of Route Determination
g) Scheduling Configuration

for this scenario we will configure scheduling based on the route

Follow the below path for configuration

SPRO –> Logistics Execution –> Shipping –> Basic Shipping Functions –> Scheduling –> Delivery Scheduling and Transportation Scheduling –> Define Scheduling By Shipping Point

We will configure here that for shipping point PA10 pick/pack time & loading time will be taken from the route as we are configuring scheduling based on the route

Picture: Scheduling based on Route

Now we need to input the pick/pack & loading time in the route so that system can pick these from the route while scheduling

Follow the below path

SPRO –> Logistics Execution –> Shipping –> Basic Shipping Functions –> Scheduling –> Delivery Scheduling and Transportation Scheduling –> Maintain Duration

Maintain the pick/pack time as 8 hrs

Picture: Pick/Pack time in route

Also maintain the loading time as 8 hrs

Picture: Loading Time Time in route

This completes the configuration of SAP two step Stock Transport Order with Delivery.

1.1.2 Testing of Two Step Stock Transfer Order with Delivery

We will test now two step stock transfer order with delivery

There are certain data pre-requisites in order to be able to execute Stock transfer order with Delivery as given below

How to Configure & Test 2-Step Stock Transfer Order with Delivery

  1. Step 1: Configure all the required Elements

    First configure all the elements required as explained in heading Configuration of Two Step Stock Transfer Order with Delivery

  2. Step 2: Extend the material in the receiving plant

    The material should be extended in both sending & receiving plant. Please check the below post for details.
    2 Minutes Guide to Create your First Material in S4 HANA – Extension of Material to Other Plants

  3. Step 3: Suppling Plant should be created as supplier in the receiving plant purchasing organization

    We will create the suppling plant PA10 as a supplier as “PA10_PLANT”. Check the below post for details
    How To Configure S4HANA BP and CVI In 7 Easy Steps – Creation of BP Supplier for STO with Delivery Scenario

  4. Step 4: Receiving Plant should be created as customer in the sending plant sales organization & distribution channel.

    We will create the Receiving Plant PA20 as a customer as “PA20_CUST”. Check the below post for details
    How To Configure S4HANA BP and CVI In 7 Easy Steps – Creation of BP Customer for STO with Delivery Scenario

  5. Step 5: Create the STO: Check “Shipping” tab should be available at the line item level. Check the different dates as loading date, goods issue date etc. These sates should be as per the scheduling configured based either on shipping point or route level as explained in heading “Delivery Scheduling and Transportation Scheduling in SAP S/4 HANA”

  6. Step 6: Create the Outbound Delivery

    Use VL10B or create the delivery automatically through batch job certain days ahead of PGI date as per business requirement. We need to configure copying control in order to create “NL” delivery on the basis of “UD” document type. Please check the below post for the detail of copy control configuration for this scenario
    SAP Delivery Guide: Outbound to Inbound – Copy Control for 2-Step Stock Transfer Order to Outbound Delivery

  7. Step 7: Pick/Pack & Goods Issue the Outbound Delivery

    Since this is 2 step delivery so movement type 641 will be used in the first step (goods issue in the issuing plant). Check the Accounting document generated

  8. Step 8: Create the inbound Delivery in the Receiving plant

    Create inbound delivery through VL31N or configure SPED output type to create the inbound delivery automatically in the receiving plant.

  9. Step 9: Post goods receipt in the receiving plant

    Since this is 2 step delivery so movement type 101 will be used in the second step (goods receipt in the receiving plant).This complete the process.

Step 1: Configure all the required Elements

First we need to configure all the necessary elements of the two step SAP Stock Transport Order with Delivery.

This is explained in detail explained in heading Configuration of Two Step Stock Transfer Order with Delivery

Step 2: Extend the material in the receiving plant

Here sending plant is PA10 & Receiving plant is PA20.

The material should be available in both sending & receiving plants. Please check the below post to see the step be step explanation of how to extend the material to another plant

2 Minutes Guide to Create your First Material in S4 HANA – Extension of Material to Other Plants

Step 3: Suppling Plant as a supplier in the Receiving Plant Purchasing Organization

We will create the suppling plant PA10 as a supplier as “PA10_PLANT” Please check the below post in detail

How To Configure S4HANA BP and CVI In 7 Easy Steps – Creation of BP Supplier for STO with Delivery Scenario

Step 4: Receiving Plant as a Customer in the Sending Plant Sales Organization & Distribution Channel.

We will create the Receiving Plant PA20 as a customer as “PA20_CUST”. Check the below post for details

How To Configure S4HANA BP and CVI In 7 Easy Steps – Creation of BP Customer for STO with Delivery Scenario

Step 5: Create the STO & check the Presence of “Shipping” Tab.

Create the STO now. Start ME21N , input all the data and press enter

“Shipping” tab with “Shipping” data should appear in the PO line item

Picture: Shipping TAB in 2-Step STO with Delivery
--> Delivery type is "NL" as configured in the section Configure Delivery Type for Two Step Stock Transfer Order with Delivery

--> Shipping Point is "PA10" as configured in the post Configure SAP S4 HANA Logistics Execution Organization Structure in 5 Minutes – Define Shipping Points

--> Route in STO is determined as "PA1020" as configured in the section Route Determination Configuration Between Plant PA10 & PA20 (Route "PA1020")
Step 5.1 : Check Scheduling in STO

Scheduling in the system should be as per the route scheduling configured in section Delivery Scheduling and Transportation Scheduling in SAP S/4 HANA

As per our scheduling

  • Transit time is 1 Calendar day.
  • Transportation Lead Time is 2 Days
  • Pick/Pack Time is 8 Hrs
  • Loading time is 4 hrs.

Picture: Delivery Scheduling

In the above screenshot we can see that

  • PO is created at 04.10.2024 12:21:45
  • Pick/Pack time is 8 hrs. so 04.10.2024, 12:21:45 + 8 working hrs. =07.10.2024 10:21:45 – This is Transportation Planning Date & loading time
  • Loading time is 4 hrs. so 07.10.2024 10:21:45 +4 hrs. = 07.10.2024, 14:21:45 , this will be goods issue date
  • Transit time is 1 calendar day so GR date & time will be 08.10.2024 15:21:45 (Receiving plant PA20 is in Boston so 1 hr. ahead from Chicago Plant time zone)
Step 6: Create the Outbound Delivery

Create the outbound delivery through VL10B or create the delivery automatically through batch job.

We need to configure copying control in order to create “NL” delivery on the basis of “UD” document type. Please check the below post for the detail of copy control configuration for this scenario

SAP Delivery Guide: Outbound to Inbound – Copy Control for 2-Step Stock Transfer Order to Outbound Delivery

Step 6.1 : Activate Automatic Delivery Creation

We configure this “Auto Delv. indicator”, If we want to create a replenishment delivery immediately after creation of the stock transport order.

Follow the below path for this

SPRO –> Materials Management –> Purchasing –> Purchase Order –> Set up Stock Transport Order –> Activate Automatic Delivery Creation and CRM Billing

Picture: Activate Automatic Creation of outbound Delivery

Now activate this for our shipping point

Follow the below path for this configuration

SPRO –> Materials Management –> Purchasing –> Purchase Order –> Set up Stock Transport Order –> Activate Automatic Delivery Creation for PO Type and Shipping Point

Picture: Activate Automatic Creation of outbound Delivery per Shipping Point

Please check the movement type & item category in the outbound delivery.

Item Category in Outbound delivery for 2-Step STO with Delivery

Picture: Item Category in Outbound Delivery for 2-Step STO with Delivery

Movement Type in Outbound delivery for 2-Step STO with Delivery

Picture: Movement Type in Outbound Delivery for 2-Step STO with Delivery
--> Movement Type should be "641" & Item category should be "NLN" as configured for 2-Step STO with Delivery

--> Movement type comes from the scheduling line configuration as explained in the Heading "Schedule Line configuration & determination for "Two Step Stock Transfer Order with Delivery"

--> Item category "NLN" configuration & determination is explained in the Heading "Item category configuration & determination for "Two Step Stock Transfer Order with Delivery"
Step 7: Pick/Pack & Goods Issue the Outbound Delivery

Now we do the pick pack & Goods issue to the outbound delivery

Below accounting document will be generated

Picture: Accounting Document in 2-Step STO with Delivery
Step 8: Create the inbound Delivery in the Receiving plant

Create inbound delivery through VL31N or configure SPED output type to create the inbound delivery automatically in the receiving plant as soon as goods issue is done in the sending plant.

Step 8.1 Output Type “SPED” configuration

We configure SPED output type to create the inbound delivery automatically in the receiving plant.

If material is handled in HUs then HUs are also transferred seamlessly from outbound delivery to inbound delivery through SPED. Please check the details of SPED configuration here.

for delivery type “NL”, we use OutputDet.Proc. “V10000” . Check the below post for this

SAP Delivery Guide: Outbound to Inbound – NL – Replenishment Delivery

Start transaction NACE & select application as V2 “Shipping” & click on “Procedures”

select procedure “V10000” and click on Control, make sure condition Type “SPED” should be available with Requirement as “1”

Picture: Output Type “SPED”

go back and select “output type” . Scroll down and select “SPED” from the list

Picture: Partner Functions in “SPED”

Select Medium “8-Special function” & Function “SH -Ship-to-Party”

Picture: Partner Functions Details in “SPED”

go back and click on condition record while selecting “V2-Shipping”

Select output type as “SPED” & create the condition record for our delivery type “NL”. alternatively we can create condition records through T-code VV21.

Picture: “SPED” Condition Record for delivery type “NL”

We have completed “SPED” configuration now

Because of triggering of output type “SPED” as soon as PGI will be done in issuing plant, system will create an inbound delivery in the receiving plant.

to check SPED trigger go to Extra –> Delivery Output –> Header as shown in the below screenshot

Picture: Delivery Output Header

We can see that SPED is triggered successfully

Picture: SPED is triggered successfully

It has created inbound delivery in the receiving plant successfully. Check the workflow of outbound delivery

Picture: Inbound Delivery Created
Step 9: Post goods receipt in the receiving plant

Since this is 2 step delivery so movement type 101 will be used in the second step (goods receipt in the receiving plant).

Post Goods Receipt of the Inbound delivery

Note: There is no accounting document generated at PGR

With PGR of Inbound Delivery , 2-step STO with delivery process is completed.

--> We can post invoice for any delivery cost. But since this is intra company Stock transfer so material cost can not be invoiced. 

Note

Sometime it is more efficient & economical to use 1-step STO instead of regular 2-step STO between the same plants.

Please see such possible Business reasons below

Maximize SAP Efficiency: Configure 1-Step STO with Delivery Alongside 2-Step STO Between the Same Plants – Business Scenarios Requiring Both 1-Step & 2-Step STO Between the Same Plants

To cater to such scenarios , please see the below post which explains How to Configure 1-Step STO with Delivery Alongside 2-Step STO Between the Same Plants

Maximize SAP Efficiency: Configure 1-Step STO with Delivery Alongside 2-Step STO Between the Same Plants

1.2 One Step Stock Transfer Order with Delivery

We will configure & test 1-step STO with delivery based on the below scenario

–> Sending plant is PA20 and receiving plant is PA10. Both the plants are attached with same company code (PA10).

Picture: 1-Step STO with Delivery

1.2.1 Configuration of one Step Stock Transfer Order with Delivery

We will configure Intra-Company Stock Transport Order Wit Delivery step by step

1.2.1.1 Configure PO Document Type

PO Document type for the One Step Stock Transfer Order with Delivery is “UD” which is same as for Two Step Stock Transfer Order with Delivery as described HERE

--> For our car business, we will use standard document type "UD" for the 1-step as well as 2-step Stock Transfer Order with Delivery"
1.2.1.2 Item Category

“Item category” for the One Step Stock Transfer Order with Delivery is “U” which is same as for Two Step Stock Transfer Order with Delivery as described HERE

1.2.1.3 Configure Pricing Schema for One Step Stock Transfer Order with Delivery

Please check the below post to Configure Pricing Schema for STO Without Delivery

Ultimate guide to SAP S4 HANA MM Pricing Procedure – Pricing Schema for Stock Transport Orders

1.2.1.4 Configure Delivery Type for One Step Stock Transfer Order with Delivery

Delivery type “NL” is used for the One step as well as Two Step Stock Transfer Order with Delivery.

Please see below post for delivery type “NL” configuration

SAP Delivery Guide: Outbound to Inbound – NL – Replenishment Delivery

1.2.1.5 Item category configuration & determination for “One Step Stock Transfer Order with Delivery”

For “One Step Stock Transfer Order with Delivery”, item category “NLN” is used same as “Two Step Stock Transfer Order with Delivery”

Please check the below post for item category configuration & determination

Mastering SAP Sales Item Categories: A Comprehensive Guide-Item Category for Stock Transfer Order with Delivery

Mastering SAP Sales Item Categories: A Comprehensive Guide-Item Category Determination for Stock Transfer Order with Delivery

1.2.1.6 Schedule Line configuration & determination for “One Step Stock Transfer Order with Delivery”

For one Step Stock Transfer Order with Delivery, schedule line category “NN” is used same as for “Two Step Stock Transfer Order with Delivery”

SAP Schedule Line Categories Explained: Everything You Need to Know – Stock Transfer Order with Delivery “NN”

SAP Schedule Line Categories Explained: Everything You Need to Know – Schedule Line Category Determination Stock Transfer Order With Delivery

1.2.1.7 Define Shipping Data for Plants

For the stock transfer order to work , the below two mandatory to define

--> Suppling Plant should be created as supplier in the receiving plant purchasing organization

--> Receiving plant should be created as customer in the sending plant sales organization & distribution channel.

Follow the below path

SPRO –> Materials Management –> Purchasing –> Purchase Order –> Set up Stock Transport Order –> Define Shipping Data for Plants

Here sending plant is PA20 & Receiving plant is PA10

a) Shipping Data for Sending Plant

Through this configuration, system needs to identify the sales organization, distribution channel & division of the supplying plant under which the receiving plant is created as customer

Picture: Shipping Data for sending plant

So as per this configuration receiving plant should be created as customer in Supplying plant sales organization “PA10” , Distribution Channel “PA” & Division “DC”

b) Shipping Data for Receiving Plant

For receiving plant, system identifies receiving plant customer number.

Picture: Receiving Plant Customer Number

Receiving plant PA10 will be represented as a customer through customer number “BPPA10” as per this configuration

1.2.1.8 Configure Stock Transfer Order

Now we will configure define delivery type and availability check for one step stock transport order.

Follow the below path

SPRO –> Materials Management –> Purchasing –> Purchase Order –> Set up Stock Transport Order –> Configure Delivery Type & Availability Check Procedure by Plant

In this configuration we specify whether an SD delivery is to be created in the case of a PO with a certain combination of supplying plant and document type. You can also specify which delivery type is to be used.
The delivery type in Sales and Distribution (SD) determines how a delivery is handled. In the standard system, the delivery type ‘NL’ is used.

Picture: Configure “Two Step Stock Transfer Order with Delivery”
a) Configure Delivery Type “NL”

Please check below post for detail of delivery type “NL” configuration

SAP Delivery Guide: Outbound to Inbound – NL – Replenishment Delivery

b) Copying Control from STO Doc Type “UD” to Delivery type “NL”

Since in the above configuration, for the 1-step SAP Stock Transport Order with Delivery, PO document type is “UD” & delivery type is “NL”, we need to configure copying control in order to create “NL” delivery on the basis of “UD” document type.

Please check the below post for the detail of copy control configuration for this scenario

SAP Delivery Guide: Outbound to Inbound – Copy Control for Stock Transfer Order with Delivery.

c) Assign one-Step Procedure

Since the stock transfer from the plant PA20 to PA10 is to be done in 1-step, here we will define the purchasing document type of stock transport orders (UD) to post the goods issue and goods receipt at the same time.

Picture: Assign one-Step Procedure
d) Delivery Scheduling and Transportation Scheduling in SAP S/4 HANA

Delivery Scheduling and Transportation Scheduling in SAP S/4 HANA for “One Step Stock Transfer Order with Delivery” is done same as for “Two Step Stock Transfer Order with Delivery” described HERE

1.2.2 Testing of One Step Stock Transfer Order with Delivery

We will test now one step stock transfer order with delivery

Step 1: Configure all the required Elements

Configure all the elements required for 1-Step STO with delivery as explained above.

Step 2: Extend the material in the receiving plant

Here sending plant is PA20 & Receiving plant is PA10.

The material should be available in both sending & receiving plants. Please check the below post to see the step be step explanation of how to extend the material to another plant

2 Minutes Guide to Create your First Material in S4 HANA – Extension of Material to Other Plants

Step 3: Suppling Plant as a supplier in the Receiving Plant Purchasing Organization

We will create the suppling plant PA20 as a supplier as “PA20” Please check the below post in detail

How To Configure S4HANA BP and CVI In 7 Easy Steps – Creation of BP Supplier for STO with Delivery Scenario

Step 4: Receiving Plant as a Customer in the Sending Plant Sales Organization & Distribution Channel.

We will create the Receiving Plant PA10 as a customer as “BPPA10”. Check the below post for details

How To Configure S4HANA BP and CVI In 7 Easy Steps – Creation of BP Customer for STO with Delivery Scenario

Step 5: Create the STO & check the Presence of “Shipping” Tab.

Create the STO now. Start ME21N , input all the data and press enter

“Shipping” tab with “Shipping” data should appear in the PO line item

Picture: Shipping TAB in 1-Step STO with Delivery
--> Delivery type is "NL".

--> Shipping Point is "PA10" as configured in the post Configure SAP S4 HANA Logistics Execution Organization Structure in 5 Minutes – Define Shipping Points

--> Route in STO is determined as "PA1020" as configured in the section Route Determination Configuration Between Plant PA10 & PA20 (Route "PA1020")
Step 5.1 : Check Scheduling in STO

Scheduling in the system should be as per the route scheduling configured in section Delivery Scheduling and Transportation Scheduling in SAP S/4 HANA

As per our scheduling

  • Transit time is 1 Calendar day.
  • Transportation Lead Time is 2 Days
  • Pick/Pack Time is 8 Hrs
  • Loading time is 4 hrs.

Picture: Delivery Scheduling

In the above screenshot we can see that

  • PO is created at 04.10.2024 12:21:45
  • Pick/Pack time is 8 hrs. so 04.10.2024, 12:21:45 + 8 working hrs. =07.10.2024 10:21:45 – This is Transportation Planning Date & loading time
  • Loading time is 4 hrs. so 07.10.2024 10:21:45 +4 hrs. = 07.10.2024, 14:21:45 , this will be goods issue date
  • Transit time is 1 calendar day so GR date & time will be 08.10.2024 15:21:45 (Receiving plant PA20 is in Boston so 1 hr. ahead from Chicago Plant time zone)
Step 6: Create the Outbound Delivery

Create the outbound delivery through VL10B or create the delivery automatically through batch job.

We need to configure copying control in order to create “NL” delivery on the basis of “UD” document type. Please check the below post for the detail of copy control configuration for this scenario

SAP Delivery Guide: Outbound to Inbound – Copy Control for Stock Transfer Order to Outbound Delivery

Step 6.1 : Activate Automatic Delivery Creation

We configure this “Auto Delv. indicator”, If we want to create a replenishment delivery immediately after creation of the stock transport order.

Follow the below path for this

SPRO –> Materials Management –> Purchasing –> Purchase Order –> Set up Stock Transport Order –> Activate Automatic Delivery Creation and CRM Billing

Picture: Activate Automatic Creation of outbound Delivery

Now activate this for our shipping point

Follow the below path for this configuration

SPRO –> Materials Management –> Purchasing –> Purchase Order –> Set up Stock Transport Order –> Activate Automatic Delivery Creation for PO Type and Shipping Point

Picture: Activate Automatic Creation of outbound Delivery per Shipping Point

Please check the movement type & item category in the outbound delivery.

Item Category in Outbound delivery

Picture: Item Category in Outbound Delivery for 2-Step STO with Delivery

Movement Type in Outbound delivery for 2-Step STO with Delivery

Picture: Movement Type in Outbound Delivery for 1-Step STO with Delivery
--> Movement Type should be "647" & Item category should be "NLN" as configured for 1-Step STO with Delivery

--> Movement type comes from the scheduling line configuration as explained in the Heading "Schedule Line configuration & determination for "Two Step Stock Transfer Order with Delivery"

--> Item category "NLN" configuration & determination is explained in the Heading "Item category configuration & determination for "Two Step Stock Transfer Order with Delivery"
Step 7: Single Transaction Goods Issue & Goods Receipt

Now we do the pick pack & Goods issue to the outbound delivery

Now we do the pick pack & Goods issue to the outbound delivery

--> In the 1-Step STO with delivery, as soon as we do goods issue to the outbound delivery in the issuing plant, goods receipt in the receiving plant happens automatically. 

--> Since Goods receipt happens automatically based on the PO (no inbound delivery is required), so there should be no "confirmation control key" in the PO.

--> Since there is no requirement of inbound delivery in the receiving plant (GR happens based on PO), there is no requirement of SPED configuration for 1-Step STO with delivery

Please check the PO history after outbound delivery PGI. System has posted Goods Receipt as well.

Picture: PO History Update after execution of 1-Step STO with Delivery

1.3 Special Scenario

We have configured a Special Scenario for Stock Transfer with STO/PO – STO with delivery – Configuring 1-step & 2-step between the same plants

Please see the details of this scenario in the below post

Maximize SAP Efficiency: Configure 1-Step STO with Delivery Alongside 2-Step STO Between the Same Plants

Image by freepik

The post SAP Stock Transport Order with Delivery: Setup, Execution & Key Insights appeared first on Ultimate SAP Guides | S4 HANA Logistics Modules.

By: admin
8 October 2024 at 19:54

SAP Stock Transport Order Without Delivery: Process, Configuration & Guide

Home » MM

In SAP Materials Management (MM), the Stock Transport Order (STO) without delivery is a critical process for transferring stock between plants without generating an outbound delivery in SAP SD (Sales and Distribution).

This method is widely used in scenarios where goods movement is handled directly through inventory management (IM) rather than logistics execution (LE).

Understanding how to configure and execute an STO without delivery is essential for optimizing internal stock transfers, reducing logistics costs, and streamlining procurement operations.

In this guide, we will cover the end-to-end STO process, key configuration steps, and its integration with SAP modules like FI (Financial Accounting) and MM (Materials Management).

Whether you are an SAP consultant, business analyst, or supply chain professional, this step-by-step walkthrough will help you efficiently implement STO without delivery and improve inventory management in your SAP system.

Stock Transport Orders (STO) are essential for efficiently managing the movement of materials between different company locations. There are some business cases where you may need to handle stock transfers without creating a delivery.

--> Stock transfer without delivery in SAP is used in various business scenarios where the transfer of goods between locations does not require a shipping document or delivery, but is still necessary for inventory management purposes or to account for delivery cost like freight.

--> A stock transport order without delivery is possible Only in Two-Steps procedure.

Stock Transport Order Without Delivery process not only saves time but also simplifies internal stock management.

In this step-by-step guide, we’ll walk you through the various scenarios of Stock Transport Order without delivery process.

Below is the pictorial representation of SAP Stock Transport Order Without Delivery.

Picture: Stock Transfer with STO but without Delivery & Billing

1. What is Stock Transport Order Without Delivery

As name specifies, Stock Transport Order Without Delivery is transferring the stock between the plants without generating an outbound delivery in SAP SD (Sales and Distribution).

--> If any of the supplier plant or customer plant belongs to the different company code then STO process becomes intercompany STO process.

--> If supplier plant & customer plant belongs to the same company code then STO process becomes intra-company STO process.

our car business has two company codes PA10 & PP10

  • Company Code PA10 has two plants PA10 & PA20
  • Company code PP10 has one plant PP10

The STO between plants PA10 & PA20 (Both belongs to Company Code PA10) will be a intra-company STO).

Picture: Intra-Company STO in our Car Business

Please see the below post for the Stock Transfer with MIGO (Without STO, Delivery & Billing)

Stock Transfer in SAP: The Best Guide with All Scenarios Explained – Stock Transfer with MIGO (Without STO, Delivery & Billing)

2. Configuration of Stock Transport Order Without Delivery

We will configure Stock Transport Order Without Delivery step by step

2.1 Configure Document Types

In this configuration, we Check and copy existing document types for purchase orders and define allowed item categories for each document type

Document types configuration controls several factors like define item interval, determine allowed follow-on document types, assign document types to a number range group & number range interval

--> For our car business, we will use standard document type "UB" for the Stock Transport Order Without Delivery

Follow the below path for document type configuration

SPRO –> Materials Management –> Purchasing –> Purchase Order –> Define Document Types for Purchase Orders

Picture: Document Type “UB”

Select “UB” and click on “Allowed Item Categories”

Picture: Allowed Item Categories

2.2 Item Category

Item category defines how the procurement of a material or service item is controlled.

For the document type “UB” item category U is used

Picture : Allowed Item Categories “U” for “Doc Type “UB”

Note : Item Categories can not be configured. These are maintained by SAP, therefore we cannot change them. However, we can change the “External Representation” of PO item categories in IMG.

2.3 Configure Pricing Schema for STO Without Delivery

Please check the below post to Configure Pricing Schema for STO Without Delivery

Ultimate guide to SAP S4 HANA MM Pricing Procedure – Pricing Schema for Stock Transport Orders

3. Testing of Stock Transport Order Without Delivery

We will test below scenarios related to the Stock Transport Order Without Delivery

  • Scenario 1: Stock Transport Order Without Delivery & without delivery cost
  • Scenario 2: Stock Transport Order Without Delivery & with delivery cost
  • Scenario 3: Stock Transport Order With Goods Receipt in Quality Inspection

Material prices for all the scenarios

Material price in PA10 plant is 1000 USD at Moving Average Price

Material price in PA20 plant is 1010 USD at Moving Average Price

3.1 Scenario 1: STO without Delivery & No Delivery Cost

This is the normal standard straight scenario related to the stock transfer without delivery

To test the STO without delivery, create a STO

3.1.1 Create a Stock Transport Order

Start ME21N and select Document type as UB

Select sending plant as “PA10”

Select receiving plant as “PA20”

Choosing the document type as “UB” will set item category to “U” Automatically

Picture: STO Creation

3.1.2 Post the goods issue in the issuing plant

To post the goods issue , start MIGO

Select

A07 -Goods Issue & R01 Purchase Order

System will automatically select 351 movement type

Picture: Post the goods issue in the issuing plant

System will fetch all the details from the purchase order

3.1.3 Accounting Document at PGI

We will see accounting document generation in both the scenario of intra-company STO & Inter-company Transfer

3.1.3.1 Accounting Entries in case of Intra-Company STO

In our scenario , the material is valuated at 1000 USD in issuing plant & 1010 USD in receiving plant

a) Material Price control is “Standard Price”

If material subjected to stock transfer is valuated at standard price then it’s price remains unchanged in the transaction

since transaction is valuated with issuing plant valuation, so there is a gain of 10 USD in this transaction.

Picture: Accounting Document Creation at PGI in STO without Delivery with Material price control “S”
b) Material Price control is “Moving Average Price”

If material, subjected to stock transfer is valuated at moving average price then it’s price changes as a result of the transaction.

since transaction is valuated with issuing plant valuation, and there is no inventory in receiving plant till yet, so after the transaction we will have 1 quantity of this material valuated at 1000 USD

As a result accounting document will be posted 1000 USD credit to inventory account and 1000 USD debit to inventory account

Picture: Accounting Document Creation at PGI in STO without Delivery with Material price control “V”
--> Please note that in the case of moving average price control of the material (V) , since there was not inventory in the receiving plant for this material before this transaction, material price updated with the valuation of the sending plant.

--> If there is inventory present before the transaction, then the material price would have been updated with average of the two. For example - in the receiving plant there is already 1 PC at 1010 USD , and 1 PC we receive through this transaction at 1000 USD (sending plant valuation) , then the resulting price of this material would have been 1005 USD for this material in the receiving plant.
c) Automatic GL Posting configuration

here configuration to post to GL is same as 2 step stock transfer as explained in the below post.

3.1.3.2 Accounting Entries in case of Inter-Company STO

Below is the accounting entries in case of inter-company STO without delivery

Here accounting entries are exactly same as in case of stock transfer with MIGO

FI document posted in the sending company code

Picture: FI document posted in the sending company code

FI document posted in the Receiving company code

Picture: FI document posted in the Receiving company code
a) Configuration of clearing accounts

In order to configure the automatic GL posting in case of the stock transfer between the plants of different company codes, we need to execute the below configuration through OBYA

Picture: Clearing Accounts between PA10 & PP10

3.1.4 Stock in Transit

One of the main Characteristics of Stock Transport Order Without Delivery is – As soon as quantity is issued from the issuing plant, it is managed as stock in transit of the receiving plant.

To check stock in transit, start MB5T and input receiving plant

Picture: Stock in Transit

3.1.5 Goods Receipt in the Receiving Plant

To do the Goods receipt in the receiving plant start MIGO

Select “A01 Goods Receipt” & R01 “Purchase Order” , system will automatically select the movement Type as 101

Picture: Goods Receipt in the Receiving Plant

System will fetch all the details, Click the item OK and post the goods reciept

No accounting document is posted in goods receipt

Stock is updated in the receiving plant as well as PO history is updated.

3.2 Scenario 2: STO without Delivery & with Delivery Cost

In this scenario we will apply the delivery cost . Let’s assume that we need to pay USD 10 in transportation to deliver 1 EA of material from plant PA10 to plant PA20 ,

We will capture this cost in stock transport order

3.2.1 Create a Stock Transport Order

Start ME21N and select Document type as UB

Select sending plant as “PA10”

Select receiving plant as “PA20”

Choosing the document type as “UB” will set item category to “U” Automatically.

go to the “Condition” tab and select condition FRB1-Freight (Value) and give this condition value as 10 USD

Picture: Delivery Cost in STO

Select the FRB1 line and click on “Condition Detail”

Enter the supplier number providing the transportation services.

Picture: Supplier providing services in STO

3.2.2 Post the goods issue

To post the goods issue , start MIGO

Select

A07 -Goods Issue & R01 Purchase Order

System will automatically select 351 movement type

Picture: Post the goods issue in the issuing plant

System will fetch all the details from the purchase order

3.2.2.1 Accounting Document at PGI

In our scenario , the material is valuated at 1000 USD in issuing plant & 1010 USD in receiving plant

a) Material Price control is “Standard Price”

If material subjected to stock transfer is valuated at standard price then it’s price remains unchanged in the transaction

system will post delivery charges to the Freight clearing account.

Picture: Accounting Document Creation at PGI in STO with Delivery Cost with Material price control “S”

This freight clearing account is cleared at the time of posting the invoice received from the transportation supplier

Picture: Accounting Document at MIRO in STO with Delivery Cost with Material price control “S”
b) Material Price control is “Moving Average Price”

If material, subjected to stock transfer is valuated at moving average price then it’s price changes as a result of the transaction.

Valuation of the material in Supplying Plant Plant PA10 – 1000 USD

Valuation of the material in Receiving Plant Plant PA20 – 1000 USD

Delivery charge – 10 USD

Create the PO and input the delivery cost along with supplier number as explained HERE

System will post the below accounting document at the time of post goods issue

Picture: PGI Accounting Document in STO without Delivery with delivery cost with Material price at “V”
--> In the above scenario, material cost in the plant PA20 is updated to 1010 USD due to loading of freight charges of 10 USD on inventory. Since there was already 1 EA was present with price as 1000 USD, so system updated the material price in PA20 plant with the average of the two i.e. 1005 USD (1000+1010)/2 

Picture: Changed price of material in PA20 plant after stock transfer PGI
c) Automatic GL Posting configuration

here configuration to post to GL is same as 2 step stock transfer as explained in the below post.

3.2.3 Stock in Transit

It will be same as in the above scenario as explained HERE

3.2.4 Goods Receipt in the Receiving Plant

It will be same as in the above scenario as explained HERE

No accounting document is posted in goods receipt

3.3 Scenario 3: STO With Goods Receipt in Quality Inspection

The Stock Transport Order (STO) with Goods Receipt in Quality Inspection used when transferring materials between plants within the same company, ensuring that goods undergo quality inspection before they can be used in production or sales.

3.3.1 Requirement for Goods Receipt in Quality Inspection

To receipt the goods in quality inspection (QI) in receiving plant, We need to check the indicator “Post to Inspection Stock” in QM view of the material master for the receiving plant.

Picture: Requirement for Goods Receipt in Quality Inspection
--> The field "Post to Inspection Stock" Specifies if the material is subject to quality inspection (without inspection lot processing) and whether a goods receipt is posted to inspection stock. 

--> This indicator is copied to purchase order items and goods receipt items.

--> If we select this indicator, then no stock-relevant inspection lots can be created.

--> If we activate a stock-relevant inspection type, this field is deselected and can no longer be maintained.
a) Quality Inspection Indicator in Purchase Order

As stated above, if this indicator is selected in material master, then this flows into the purchase order “Delivery” tab.

Picture: Quality Inspection Indicator in Purchase Order
b) Quality Inspection Indicator in Goods Receipt

As stated above, if this indicator is selected in material master, then this flows into the Goods reciept.

Picture: Quality Inspection Indicator in Goods Receipt
c) QI Stock in Receiving Plant

Now we can see that after GR QI stock is generated in receiving plant for this process.

Picture: QI Stock in Receiving Plant

This completes all the scenarios of Stock Transport Order Without Delivery

Image Courtesy: www.freepik.com

The post SAP Stock Transport Order Without Delivery: Process, Configuration & Guide appeared first on Ultimate SAP Guides | S4 HANA Logistics Modules.

By: admin
29 September 2024 at 19:58
❌
❌